CREATIVE_ARCHITECTURE
  • Home
  • About
  • Projects
  • Services
  • Useful Info
  • Contact
  • Home
  • About
  • Projects
  • Services
  • Useful Info
  • Contact

RESIDENTIAL


Ashes Lane 10 Unit Development, Springhead

Completion: Phased Completion 2020-2022
Work Stages: RIBA 2-5

Role: Architect
Contractor: Charnwood Projects
Building Regulation drawings and sign off obtained for 6no. 4 bed semi-detached, and 3No. 5 bed detached, brick, 3 storey dwellings. Design and planning permission secured for an additional detached dwelling, with amendments to previously approved designs to each of the detached units to enable the developers to maximise both the number of units on the overall development plot, and the size of each unit on each individual plot. Phased completion and sale of the 10 units between 2020 and 2022. Each property provides contemporary open plan living spaces opening out onto rear garden areas, with good sized bedroom and en-suite accommodation above.
Completed:
Proposed drawings:
Before and during construction :
​Call us on 07788200255 to discuss your project
​

© Creative Architecture Ltd : Spaces Designed For You
​
No.1 The Long Stables, Rochdale Rd, Denshaw, Saddleworth, OL3 5UE | Data Policy
Copyright © 2021 Creative architecture Ltd. All Rights Reserved. Registered in England 9107652
Picture
Picture